Wednesday, August 10, 2011

Air Traffic Control Room - First Floor Walls

walls

wall

wall opening

After creating the floors, I began working on the first floor wall assets.

I wanted to have a curved wall, but knew it would be difficult to make the high poly curved as well. I decided to make the High Poly that would match up to a flat mesh, and then transfered the UV coordinates to a curved mesh. It worked out pretty nicely.

I also used the same method for a wall with and opening

No comments:

Post a Comment